Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate the weight of 6mm dia rod

Answer Posted / amit

the we use d*d/162 but the original formula where it is derived from is

take 1mm rod as
the sample
-----
| |
| |
| |
| |
----- aassume it as cyinder
and try calculating the area using
22/7*r*r*h

Is This Answer Correct ?    1 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.

2523


What is rate for brick masonry work of 1.0 m3 in cm 1:6?

1157


What in your past experience or education prepares you for the position for which you are applying

2198


where can i get the previous question papers for rrb section enginerr (civil)

2323


Define What materials were used to build the Golden Gate Bridge?

1102


why we are useing plastic under the lean concrete?and whts the advantage?

2714


how lap length is increased with increase of Grade of steel?

26967


How to do base isolation using ETABS software?

2949


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

2108


For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?

1786


What is need for setting limits?

1120


On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??

3277


What is a kip?

1179


How many types of slabs are there & how to design it?

1274


Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

1966