Answer Posted / vishal
then wtz tie beam and foundation beam?? is this diff. types?
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is m30 in concrete tiles
what values & beliefs have guided you in your career path
What is the ideal size of the living room ranges from small to large size?
what is detail procedure of eccentric footing? plz. give solved exmple?
List out some of the software program that can be useful for architect?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
how much cement sand n bricks required in im3?and how much in plaster?
Define What is an ice dam sock?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
how much cement and sand required for 1cum rr masonry
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Is there any course for billing available in Mumbai? If yes then please mail me the details..
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
I need old MMUP exam question and answer for Civil engineering