Answer Posted / sivasubramanian
Sachin Kumar u have missed
Propped Cantilever beam
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
What is unit weight of normal concrete?
How do you change a dimension value in solidsworks?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
What is the outturn of Ceiling plastering
Which is the direction for positive angle?
how meny typs of renging rod?
for pretensioning which will yield first and same for post tensioning?
what is difference between fluidity and workability also how palsticizer works
Process of pcc in wateredug
is basic cost of the material includes tax?
What is the best type of wood glue?
how to design and calculate materail quantity for concrete speedbreaker ?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
What are the basic use of runners and standards of pipelines?