How to calculate the steel for 392c.meter*450c.meter rcc
slab
Answer Posted / deepak
steel percent,for Fe250-0.15% of Area of slab.
Fe415-0.12% of area of slab.
area of slab=392*450 m^2
=176400m^2
slab reinforcement=0.12%*179928=215.913 m2
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
What is a bearing capacity of soil?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
Can we use the flyash bricks in brick bat coba?
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
pls give me some basic informations in construction of a structure?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
WHAT DLC DESIGN IN CONSTRUCTION
significance of specific surface area of particles?
what is cross hair cursor?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Cement consumption of one cubic meter of aerocon blocks masonry?
how to calculate testing date