Answer Posted / yogesh babu
BULDING CONSTRUCTED BY THE USE OF MAXIMUM NATURAL RESOURCES
OTHER THAN RENEWABLE MATERIALS EXAMPAL FLY ASH BRICKS, TOP
LAYER OF EXAVATED SOIL FOR GARDENING ETC.certified under
LEED IGBC is considered GREEN BULDING
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
What is Gsb tollens ?
States some of the commonly used commands in cad software’s?
150mm bricks size how many use 4.14 m3
how much one carpenter can doing shuttering of slab in one day
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
afe or not
Who designed the city of washington dc?
Which are the Steel tests ?
Explain what is change order request?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
What is modular elasticity?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
In cement making,what is meaning of blend,fineness,density.