Answer Posted / arvind rai
Actually, the concrete material depens on their ratio or proportion.without this we can not find out how many materials are required in 1cum concrete.
Hence ration is required.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
whaat is blister in box girder bridge and what is its function..
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
How to calculate woden area in sft and Cft
Coverage of 25mm.thick ratio of 1:4 cement mortar?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
Define What is the distance between railway tracks?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
how to clculate the %of concrete strenght achive after curing?load
What is Curtailing of R/F
what is cement wastage percentage in NHAI ROAD WORKS
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
What is Time period of a building and its relation with frequency ?
Explain the various stages of the project planning process in construction?