Answer Posted / balbhadrasinh
1 cement
2 sand
3 aggregate
4 water
| Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
how much required strength of cement concrete bricks(size 230x115x75mm)
how much to get of BRC lapping in full yield and half yield ?
Are cruise ships built for the transatlantic run?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
please send me bhel questions on rupesh.017@rediffmail.com
what is the effect of duration of earth quake on framed structures ?
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
how many material required for brickbat water proofing of toilets.
How many feet are in 4 square yards?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
What is the difference between routing maintenance and major maintenance in school facilities?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What materials were used to build the golden gate bridge?
What is thumb rule for deep trench excavation
Which is stronger solid steel rod or hollow steel pipe?