As shown in IS 456-2000 minimum cement content is include
fly ash?
Answer Posted / ravikant sharma
for pcc work 220 kg
for rcc work300 kg
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
How we calculate the service time of buildings
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
I need old MMUP exam question and answer for Civil engineering
What are the uses of groynes?
how to calculate spacing rod in column
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
How to calculate plastering for elevated water storage tank
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
undistributed samples are obtained by
what will happen if one could not properly follow the spacing of slab reinforcement bar?