How to preparation billing for high rise building? anyhow
can give the tips
Answer Posted / sjtbehera
it is very easy. if you can calculate ground floor area,
you can calculate entire buildg.
| Is This Answer Correct ? | 18 Yes | 2 No |
Post New Answer View All Answers
What is the difference between 53 grade and 43 grade cement
Define What glue is least sticky?
How is the strength of cement measured?
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
Special thing in designing a overhead reservoir ? which is different from an ordinary design
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
List out the types of roofs?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
Which is the direction for positive angle?
How to calculate the quantity of ingredients of M20 grade concrete?
who to find building iron rod strenth
How to calculate chejja reinforcement
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?