Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

shape of aggregates used in concrete should be
rounded/cubical or elongated/flaky.

Answer Posted / nadim

the shape of an aggregate should be angular

Is This Answer Correct ?    17 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

2350


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2451


What are advancements in civil engineering?

1045


importance of the soundness test to determine the quality of cement use for any construction

2130


what is the procedure of wet seiving. n percentage of silt in different type of soil?

2610


what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE

4082


Define What is the best type of wood glue?

1136


How much cement will require for 1Rmt Skirting laying

2286


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

2091


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

1615


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2842


what is right & short method of measurement of slab&beam

2059


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

2286


What is the cost difference between site mix and ready mix concrete per cubic meter

1864


how to calculate the strength of rebound hammer test reading in building construction ?

3344