Answer Posted / lakshmanaraj bg
pilot testing:
Pilot Testing is a Testing Activity which resembles the Production Environment.
It is Done Exactly between UAT and Production Drop.
Few Users who simulate the Production environment to continue the Business Activity with the System.
They Will Check the Major Funtionality Of the System before going into production .This is Basically done to Avoid The highlevel Disasters.
Priority Of the Pilot Testing Is High and Issues Raised in Pilot Testing Has to be Fixed As Soon As Possible.
Pilot testing involves having a group of end users try the system prior to its full deployment in order to give feedback on IIS 5.0 features and functions.
The level of pilot testing you want to perform depends on the size and scope of your migration project.
For larger projects, a formal, carefully planned pilot is essential.
For any size project, its good to have selected end users test the system prior to full deployment.
The following are items to include in planning a pilot test:
1. Adequate training for participants.
2. A roll out plan for deploying the servers and preparing systems for the pilot.
3. Documentation of the installation process so you can improve it as more is learned.
4. A mechanism, such as a Web site or e-mail alias, for users to provide constant feedback to the design and testing teams.
5. Evaluation criteria for the pilot, including information about the number of users who were dissatisfied, the number of problems reported, the number of support calls and requests, and the resolution rate for problems.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Hi i am looking for Test Engineer Job, i have done the course, but i don't have work experience on it, Is it So important to have real time Exp or knowledge is enough? and please let me know like how i can improve for the interview. You can send me a mail on this id: rashmi_vastred@yahoo.co.in
what is coupling integration testing
Hi could some one please send me the testplan testcases(for 2Modules) and testscripts for mercry fliht aplication or gmail. please write those on templates and send me.In testplan plase write Testobjective, test scope, est approach, exlusions assumptios.
What do you think the role of test-group manager should be? Relative to senior management?
What is bottom-up approach?
What is the responsibility of programmer’s vs QA?
how will you test transfer funds module...explain in detail
What is desk checking and control flow analysis
Hello again!! wanted to ask you HOW EXACTLY create stubs and driver in integration testing? 2.whats the difference between integration testing and system integration testing? Thanks!!
KINDLY FORWARD ME THE INTERVIEW QUESTIONS & ANSWERS FROM REAL TIME POINT OF VIEW FOR 1.5 YEARS EXPERIENCED CANDIDATE. MY EMAIL ID IS sky_bird433@yahoo.com
What is the difference between pilot and beta testing?
What is mean by multi-threading testing?
What are the uses of test plans? What is the need of test plans and explain their significance
What is a maturity level?
Plz give me manual testing real test case ?