what is the meaning of TMT Bar and what is benifit of these
Bars?
Answer Posted / m.sivarama krishnan
TMT means Thermo Melting Treatment. These bars have the better characterization like Yield strength, Ductility and Bend ability.
| Is This Answer Correct ? | 6 Yes | 52 No |
Post New Answer View All Answers
what is the theoritical percentage of concrete cubes testing per day?
What is passive earth pressure ?
What year was the keystone power plant in Indiana County constructed?
Aptitude, reasoning, quants, verbal and technical question
Technical Question of Civil Engineering
i want texture painting pwd data
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
How to testing voids of filled aggregate in bitumen mix design
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??