Answer Posted / akhilesh kumar
2.65
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
115mm thickness brick work how to required mortar
what is the water cement ratio for plastering
What is the software used in civil engineering?
What are your goals?
Prepare a Schedule for a Highrised building from starting stage to Handover?
How many axes do cartesian coordinate system has?
what is the use in canals of longitudinal drains and cross drains in lining areas?
What is the difference between routing maintenance and major maintenance in school facilities?
what is the construction cost for per cft of multistorryed building in kolkata?
how we check the thickness and line of ceiling plaster.
Why should you consider yourself fit to be hired by jindal steel.
What do you mean by the word 'shear'?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard