Answer Posted / himanshu kushwaha
Basically classified based on useage requirements,
1.Accordind to core.......
*core type transformer
*shell type transformer
2.Accordind to voltage...
*step up transformer
*step down transformer
3.Accordind to phase....
*single phase transformer
*two phase transformer
*three phase transformer
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.
I want to merge a cable..in between two metering Cubicals which contains CT's and PT's and Energy meter..before taking merger..what are the common things required?
What is the tipical Online UPS input voltage for 20 KVA load ( 3 Phase or 1 Phase )? Why ? Explain it...?
15hp motor wound by 0.9mm & 0.95mm magnet wire. at no load test it draw 4.2A current. Another motor with same condition draw 9.2A current. How can that occur? pls help
What is the meaning of C1, C61, C91 cable
what is RNG in the DG synchronizing by PLC?
1. A bomber drops a bomb from an aircraft flying at 2000 km/hr. at an altitude of 7km. The speed at which the bomb will strike the earth would be
Difference between HRG and NGR. Are they both the same thing
he compression ratio for a petrol engine generally lies between
if we apply 1000ADC instead of 100ADC or We apply 50ADC instead of 100ADC,What will be happened in the test result value.Pl explain
What is the difference between a fuse and a breaker?
1. what is usage for power factor in industries?? 2.why we need to monitor power factor??
WILL SCHNEIDER MAKE ACB(MASTERPACT)TRIP ON REVERSE POWER?
WHY EARTHING NOT NEEDED IN BATTERY IN SUBSTATION
If i have two 3000 kW motors and the whole facility requires a 10 MVA transformer. What would be better installing two 5 MVA transformers(one for 1 motor ) or just a single 10 MVA transformer for both of them. Give reasons for your answer.