Answer Posted / shilpa.o
'V' model is a software devolopment and testing model which
helps identify need of planning and design of testing in
the early stage of devolopment process.One arms of 'V'
model is conventional waterfall model whereas another arm
of 'V' shows corresponding testing methodology required at
each phase of devolopment process.Here devolopmemt and
testing are parallelly done.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
please send me interview questions asked in google in testing - manual
Tell me some Adhoc testing scenarios of ebay (online auction product)?
Can anybody give me some tips on how to face telephonic interview and Write some expected telephonic questions as a 2+yr exp. in testing. Try to give Ques. that u already hv faced in telephone. Plz Help me out friends.
Can you explain requirement traceability and its importance?
What is the difference between qa, qc, and testing?
What are joins and subjoins in the data bases what is data driven testing what is verification and validation What is Quality Assurance (QA) and Quality Control (QC) Is Verification is related to QA and Validation is related to QC ? which type of model you follow basically in your project what is a use case How to test a Bike how to test a Lift (Elevator). which configuration Management tool do you use which Bug tracking tool do you use explain Bug life cycle what is Regression testing what is ALPHA testing ans BETA testing What types of testings comes under Non functional testing what is TEST DIRECTOR what is CMM and CMM i whar are Expressions in Winrunner What is a Compile module Is it Necessary to open the tool first or the application first after getting a bug what will you do if you add a new object or a new module for the existing application then how will you test the application which Defect tracking tool do you use what is change management What is smoke Testing what is sanity testing A application is given to you but the requirements and functionalities are missing what will you do to start the testing which testing documents will be received by the client
Define Stability, Scalability and reliability with example ?
How quickly we need to fix the bug?
How can you do the usability testing?
can anyone tell me few critical bugs in ecommerce project.
On what basis you are fixing up the time for project completion?
what is date field test case
Difference between Stakeholder and Relevant Stakeholder?
Which of these techniques is not useful for partition testing at the class level Option 1 attribute-based partitioning Option 2 category-based partitioning Option 3 equivalence class partitioning Option 4 state-based partitioning
If I want to check compability of software in a MAC OS then which steps shold I follow?