Answer Posted / mdzaki uddin
1.6/5.5=.29*1440+417.6/50=8.35 bags of cement (1.6 is factor,5.5is ratio example m20 1+1.5+3=5.5,1440 =cement volume
sand=o.29*1.5=0.435 cum then 0.435*35.32=15.36 cuft,
course aggegate=0.29*3=0.87cum then 0.87*35.32=30.72cuft
my mobile no:9885815803 call any time royal civil
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is the meaning of soil reinforcement?
Aptitude, reasoning, quants, verbal and technical question
How to calculate Volume of Wet cement concrete for a specific grade?
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
what is civil engineer greatest strength and weakness?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
What is the standard volume of pharma in cub ft
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
What is Grid floor and mention its advantages ?
what is E
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
What is the difference between one-way slab and two-way slab?
What is the largest concrete dam in the world?