What are Standard weights for concete of
gradeM10,M15,M20,M25,M30 Etc.
Answer Posted / ravindra chavan
for PCC 2400 kg/cum
for RCC 2500 Kg/cum
| Is This Answer Correct ? | 27 Yes | 3 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
How do you convert wind speed into force?
Define What happens to Load at yielding ?
Civil engineering related
All aptitude question of Bechtel
how do we design mix ratio?
what is m30 in concrete tiles
how to caluclate sienerge qty in construction in ap
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
What is portland cement
how is the reinforcement is distributed in triangular slab
What is the method of soil replacement test?
In reclamation works what are the importance of geotextiles and sand?