Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to implement 6 output with 3 input NAND gate?

Answer Posted / wareagle

Input 1 output 1
Input 2 output 2
Input 3 output 3
Input 1-2 output 4
Input 1-3 output 5
Input 2-3 output 6













Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to check 11000/1.732 to 110/1.732 Potentila transformer (PT)?

2208


How energy is generated in hydroelectric power plant?

1299


Draw the single line diagram of the power station?

1084


Testing procedure of DG alternator stability test

1563


what is meant by poly phase induction motor ? how its operating by single phase or three phase?

2157


how the inner and outer body is separated in aircrafts?

1103


when 20hp 3 phase motor start no load condition in star or delta connection.find current and write formula.(tariq)

2072


What are test values for an 63 KVA and 100 Kva Distribution Transformers for the following typical tests 1)Magnetic balance 2)Short circuit test 3)Open Circuit test 4)Vector group confirmation test .please give me the standard values for all the above tests.

2717


What are the different losses In a de mac1une'! t.xplam

2748


how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you

2003


How to calculate main incomer rating of APFC Panel ? Let's say i want to find main incomer for 11kV, 1000kVAR Panel.

1952


How do the synchronizing lamps indicate the correctness of phase sequence between existing and incoming alternators?

2181


(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)

1866


Why syn. Generators are used for the production of electricity?

1160


when generator short circuit condition, the current how dissipates. or at short circuit voltage not available then current how can flow?

2179