what are the types of welding machine?
Answer Posted / deepak
1).Arc Welding Machine
2).Tig Welding Machine
3).Mig Welding Machine
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
QUSETION PAPERS SOLVED FOR THE LAST 4YEARS RRB EXAMS
in regenrative cycle why to use two liquid(water&mercury) on steam genration cycle.
What are some mechanical laboratory apparatuses?
"What is the remedy if due exchanging, valve broke out during engine running operation?"
What do you understand by the concept of a 6 stroke engine? Explain how it works.
Mention some of the major contributions made by you in your present and previous jobs:
On which analysis is based the dulong’s formula for the heating value of fuel ?
Explain the Classification of Welding Process?
What is the function of a thrust bearing?
What are the defects in exhaust valve?
What is view factor ?
What causes damage to impellers?
DOES IS 2062 SPECIFIES ONLY SEAMLESS PIPES OR ERW PIPE IS ALSO COVERED UNDER IS 2062
"When you will install a new piston ring, what will be the position of it?"
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb