Answer Posted / pramod rajput
2450 kg /cmtr
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is Critical path in Ms-Project ?
what is parametre for M25 after 7 days strength
How to calculate material and labor required for 100 m2 plaster?
what is mc arther pile?
How can we demolish concrete beams?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
How can we make a hole in a solid rectangle using solidsworks?
what is high type road and low type roads
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
How to cal. The weight of hollow pipe?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
what is the construction cost for per cft of multistorryed building in kolkata?