Answer Posted / sheik.s
Shuttering is the structure prepared by mostly wood or steel
for pouring of concrete. centring is vertical spports for
withstand that..
| Is This Answer Correct ? | 13 Yes | 4 No |
Post New Answer View All Answers
what is the water cement ratio for plastering
What is difference between combin footing & rapt footing
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
what is the coefficient for running feet to cft coversion both area and price
What is meant by autocad?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
Define What glue is least sticky?
What type of tensile strength is handling by crank in beam? Thanks.
What is gravity flow?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
Minimum and maximum size of the building components
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
how many spacers we need for 1 ton reinforcement? aprox.