Answer Posted / vijayakumar
Cement - clinker 1290-1540 kg/cum
Cement, Portland 1506 kg/cum
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
What should be the standard roof height like to be?
How to calculate carrying capacity of the existing water supply trunkmain
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
how to calculate the steel in 500yard
Specific gravity of cement?
Which is the latest version of solidsworks?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
What is absolute pressure? How absolute pressure is calculated?
any book or article on pumped concrete.
How to do base isolation using ETABS software?
What are the methods of measurement? Describe it shortly
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
what is the difference between natural draught cooling tower and induced draught cooling tower