Normally in slabs, steel quantity is not added when you
calculating concrete quantity for that slab, why it is not
added ?
Answer Posted / sumit
During concreting some concrete is wastage so steel quantity
is not calculated generally and no-one IS code says that
steel quantity calculated in concrete
Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
what is the type of earthing
what is meant by residual strain?
How can we convert weight batch to volume batch for m30 mix
density of crush sand & crush stone or grit powder
Which prize is the alternative to the NOVEL Prize?
Explain soil analysis?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
can i get hindi version of is codes based on civil engineering?
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
Define What is aggregate?
Mention different types of roof systems?
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
how water proof chemicals act in concrete to avoid leek?