Normally in slabs, steel quantity is not added when you
calculating concrete quantity for that slab, why it is not
added ?
Answer Posted / sumit
During concreting some concrete is wastage so steel quantity
is not calculated generally and no-one IS code says that
steel quantity calculated in concrete
| Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
what is the minimum compressive strength of clay brick
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
What out turn civil works
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
what is the basic difference between Coloumn & Shear Wall
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
How much cum. Brick work can do by 1 madon
What are the types of slump?
I have an span length 16 ft c/c
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?