Normally in slabs, steel quantity is not added when you
calculating concrete quantity for that slab, why it is not
added ?
Answer Posted / sumit
During concreting some concrete is wastage so steel quantity
is not calculated generally and no-one IS code says that
steel quantity calculated in concrete
| Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
is concealed wiring a problem in fly ash brick wall?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
how many shuttering material required for 1000 sq.m built up area.
What are the types of slump?
How to compute minimum number of columns required for a site from area of site?
what is project?
What is difference between engineering stress and true stress?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
States some of the tool bars used in cad?
acceptance criteria for concrete works
I need to constructive work in amaraj batteries
what is detail procedure of eccentric footing? plz. give solved exmple?