granite tiles laying 60/sq ft.how to convert in sq mt,what
is the mltiplying value.
Answer Posted / reetheshmp
the multiplying value is 0.929
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
All aptitude question of Bechtel
What is meant by engineering drawing?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
what is the use of water bar in water tank and is this an extra item in estimate?
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
Define Workability ?
How to calculate plastering for elevated water storage tank
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
what will be price of 1:2:4pcc per kg?
What is construction mitigation management?
Would you cause a 55-gallon drum of water to weigh more by climbing in?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is the biggest dam in america?