Answer Posted / reethesh.m.p
24 hours
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Explain the different types of building contracts?
What are the responsibilities of a site manager?
The mixture of different ingredients of cement is burnt at?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
How will be cutting in timber plate size 600*400 column size
rate analysis for cement pointing 1:4 , for 100 sq m
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
What is difference between engineering stress and true stress?
How can I make justification between using concrete grade c35 compare c37?
What are the different methods for drawing an arc?
Define What is diversion tunnel in a dam?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
Define What is rigging?