for selection of transformer we will considering 5 to 6
times of starting current of higher rating motor connected
to secondary side. according to process wise we will start
the motors gradually suppose if we will start 15 to 20
motors at a time wat will happen?
Answer Posted / wareagle
If you start all of the motors at the same time then you
will have the sum of the lock rotor amps time the number of
motors occurring at the same time. You may trip the primary
transformer breaker.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
A cable with concentric PE conductor must be used with frequency converter circuits what does its means.?
Difference between low impedance and high impedance Restricted Earth Fault
1 “earthing” for bonding of equipment and circuits to common plant earth electrode potential, 2 “protective earthing (PE)” when this bonding is required for personal safety provisions 3 “grounding” for interference suppressing bonding of screens, sys-tems with ground level 4. low-impedance earthing ? 5.primary earthing system and secondary earthing system what is that? 6.earthing electrode or mesh net earthing electrode ? very confusing , simple but very informative help required ? i will be very very thankful to you guys.
How to calculate LT XLPE CABLE for 11 kv / 433 v , 1000 kva oil type transformer system?
what is the difference b/w pvc cu conductor and cu breaded wire..?
What are the internal and external faults?
Hi Suppose we have a wye/wye transformer which is grounded at both sides,in this situation, do we have ay ground transformer? in other words, ground transformer can do any thing more (while we have nuetral wire in both sides)? As the last question, what about 3rd harmonic? we have two choices: first using wye/delta transformer + ground transformer and second using wye/wye earthed connection.in the former choice, we dont have 3rd harmoonic at the secondary side but what about Yn/yn conection? do we suffer from 3rd harmonic in the Yn/yn connection?
what does mean of RCT and STR in diffrential CT?
what are the interview question asked in wind mill about electrical
we have amp, voltage, kw, length detail then how to calculte copper & alluminium size of conductor of 3-phase induction motor
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
what is mind in cable
What are the advantages of nichols chart?
What is the principle of HIGH SPEED DIRECT DRIVE MOTOR ?