if L*B*H = 20
then direct no of bricks =20 *500

Answer Posted / jeyakumar

20*500=10000 this what theoretical Requirement/m3. Actual requirement as per site condition 20*436= 8720 (Excluding CM)

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the RISKS during the project construction?

1735


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

1905


how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...

1897


rimmer in pile foundation

2135


What is bylayer?

682






The concrete slump recommended for beams and slabs; is?

759


to draw bm diagrams for portal frames under different loadings//

2436


why we use aggregate,sand with cement in concrete?

8111


How much area will be covered in 1 litre of Velvet touch paint in normal wall condition

946


What is the maximum strength of cub compress strength in one cub testing

1381


How to calculate plastering for elevated water storage tank

820


How much cement will require for 1Rmt Skirting laying

1885


Explain creep?

691


density of crush sand & crush stone or grit powder

6301


what are the code used for residental building?

2046