if L*B*H = 20
then direct no of bricks =20 *500
Answer Posted / jeyakumar
20*500=10000 this what theoretical Requirement/m3. Actual requirement as per site condition 20*436= 8720 (Excluding CM)
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What are the RISKS during the project construction?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
rimmer in pile foundation
What is bylayer?
The concrete slump recommended for beams and slabs; is?
to draw bm diagrams for portal frames under different loadings//
why we use aggregate,sand with cement in concrete?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
What is the maximum strength of cub compress strength in one cub testing
How to calculate plastering for elevated water storage tank
How much cement will require for 1Rmt Skirting laying
Explain creep?
density of crush sand & crush stone or grit powder
what are the code used for residental building?