Answer Posted / yasser
Measurements, calculations & Math
| Is This Answer Correct ? | 6 Yes | 8 No |
Post New Answer View All Answers
During reclamation how can the occurrence of mud waves can be rectified?
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
List out the potential risk factors for workers on the construction site?
why building got air crack? if it get in one particular are what is means?
Explain moment of inertia and its importance.
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
What is the difference between shear and tensile strength?
What is the Maximum %age of Steel in columns and beams ?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
how calculate the bearing from two coordinates?
How many axes do cartesian coordinate system has?
PL.tell me about civil engineering questions with answer
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
Define mirror?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr