Who does integration testing ? Developer or Test Engineer?
Answer Posted / jitendra
Integration Testing is divided as low level integration testing and high level integration testing. Low level is performed by developers and high level integration is done by testers.
In low level , they try to integrate units together and in high level integration testing, we see how well a page is integrated with other pages.
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
Zenq interview questions for manual testing
how to write manual testcases for download the files from the template. for example:from product cost enddate
what is the relation between all tabs in quality center & explain the testing process in quality center with tabs?
What does entry and exit criteria mean in a project?
What is a test server?
How we allocate the priority(Blocker, Critical, etc.,) in Testing?
Test cases on send/ receive button of Microsoft outlook.
What is a ‘test plan’?
Explain the procedure for manual testing.
write test condition for testing SMS service of a mobile phone maximun length is 100 character while sending and 80 character for receiving write test scenarios do not write test cases
Architectural structure of the insurance project?
difference between change management and configuration management
Hi All. How can we write negative test cases for Logout Operation ? Please place the answer with a few details and if possible add some related object properties. "A tester exposes his/her ability not only by words he/she also proof it by work"
What impact ratings have you used in your projects?
What is smoke testing and user interface testing ?