Answer Posted / gr (qatar)
Language of lines
| Is This Answer Correct ? | 8 Yes | 10 No |
Post New Answer View All Answers
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
What is pre-stressed concrete?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
Will going from a 3-tap to 6-tap increase water pressure?
What is the diff between cad & cadd?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
what is escalation?how it is done?
where can i get the previous question papers for rrb section enginerr (civil)
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
How can explode a block?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
List out the types of roofs?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??