what is cement mortar cube size and strength in 3days,
7days and 28days
Answer Posted / sinjini choudhury
150*150*150cm3
| Is This Answer Correct ? | 16 Yes | 20 No |
Post New Answer View All Answers
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
How to build the floor to ceiling bookcase?
from where ican get sample papers for CET-delhi 2012
why we are useing plastic under the lean concrete?and whts the advantage?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
Explain different types of rcc pipes.
What are the ingredients of pre-stressed concrete?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
The definition of national highway
how much shouid be the rate for ready mix concrete per cubic meter