while doing floring in a room,from where one can start
laying tiles.
Answer Posted / sobhanbabu
tiles always start from main entrance only.becoz pieces wont come near the entrance and pieces comes at corners.
if any threshold comes near the door frame we can start from any corner.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
how many material required for brickbat water proofing of toilets.
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
How can I make justification between using concrete grade c35 compare c37?
Define line type?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
what is work of planning deptt. in any construction compny (in road project)
What are the uses of alloys in daily life and how are alloys made?
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
What quantity of 1.0 m3 bricks required?
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
How many square meter can a worker/labor demolish a structure per day?