Answer Posted / patel
1.level the surface
2. prevent dampness
3.avoid corrosion
| Is This Answer Correct ? | 22 Yes | 1 No |
Post New Answer View All Answers
what is civil enginnering & what you need of this course?
use ofr concrete as per grade ?
what is hydrostatic paradox?
In reclamation works what are the importance of geotextiles and sand?
how to find quantity of concrete in PCC M15
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What is the usage of zoom command?
How did street originate in the plumbing term street ell?
it is possiblee to produce concrete with out cracks...
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
which type of instrument included in plumbing work?name of instrument?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
Why is concrete cube test carried out?
how many BSCs can i connect to the HUAWEI MSC
Why concrete barriers have curved surface profiles?