Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

If a generator of generating station produces 100MW rated
output then what will be the rating of the step-up transformer
connected to it?

Answer Posted / mahendran

the step up transformer connected depends upon the generator output voltage

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

can anyone provide me a amf panel control wiring using ec-2 relay?

2302


at what rate the micro controller increment its timer....is it 1micro seconds or 1/(12*10^6) seconds

1792


what is the use of current transformer in power transformer secondary side.?its connectyed in WTI

1727


What type of DC motor would you see for a lift?

1094


how indusrial diesel generator work

1922


What happens to a line-frequency of high-frequency transformer when it is first energized/ re-energize?

2156


Which power will flow first if we switch on a motor Active or Reactive? How?

5585


orifice sizing how done, checking & selection

1965


What is the limitation of kirchoffs law?

1136


Classify driling machines.

1118


why ten delta testing is carried out on power transformer

1819


what r the checklist while installing a 380 kva DG set

3798


If a air condition consume 2.50 to 3.00 amp then how much it will consume in watts if it is running 10 hours out of 24 hours????

1867


This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.

2479


i want to know how to determine that a surge arrester work properly in 11kv system. and how to test a 12kv surge arrester

2164