Answer Posted / sandeep
0.8% of cross section area of the column
| Is This Answer Correct ? | 20 Yes | 1 No |
Post New Answer View All Answers
How to make tiles floor step by step procedure?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
what is the steel difference between np-2 and np-3 pipes and weight also
(Project Management Topic) What are the important criteria in the successful realization of the project?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
How much cement and water required for cement selery????
What is the biggest dam in america?
what is modular brick and it size
What is a kip?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
what is total volume of ingredients used in concrete accordingly