what are the types of bridges respective to the span ?
Answer Posted / mansu
mainly 6 types of bridges are:cantilever,arch,beam, truss,cable-stayed and suspension bridge
| Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
where can i get the previous question papers for rrb section enginerr (civil)
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
Describe the advantages and disadvantages of using plastic and timber fenders?
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
What is horizon or horizontal mining?
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
How do you compute volume of airflow?
Formula of area of crane hook
in design case of structural member best suitrable percentage of steel limit is what
Time required for curing of wall tiles before fixing
How to calculate brick work quantity?? Block work quantity??
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?