Concrete Mix designs for M15,M20,M25,M30 and M35
Answer Posted / sanjay
yes
| Is This Answer Correct ? | 60 Yes | 21 No |
Post New Answer View All Answers
what is diversion?
What is the coeffiencent Friction Angle between Steel and Ashphalt?
3. What are the disadvantages of your present job, things you do not like about it?
Describe a time when you anticipated potential problems and developed Preventive measures
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
How much time Required for PPR pipe network testing
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
What is the biggest dam in america?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
what are the types of design? which type of method is used at what type of design & why?
What are the advantages and disadvantages of lead products in construction?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
dialation means
what does the track parameter mean in staad.pro?