What is The meaning Of Auto cad And Also Define What Is
Drawing According To You

Answer Posted / anantharamu.g

it is a impartant software in 2d and 3d technologies.
actually this used to drawing and planning a shape of a
picture and building. it is more helpful to the civil
engineers for their professions.

Is This Answer Correct ?    17 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the yield of 100 litres of water and 10 kg of cement in grout mix?

1575


How to do rate analysis for concrete work including shuttering work?

1549


specifications of fe500 steel

3036


How to calculate laplength for 3 floors

1345


Consumption of Binding wire for fixing of cover block in vertical surface

1033






quantity of material needed for rubble stone masonry for 1:4 and 1:6

1218


How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?

1190


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1764


225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.

2922


3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.

1629


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

1495


What is the purpose of the gap in the road on this bridge?

691


i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

1879


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1201


Why reinforcement done in shorter span in two way slabs

1374