Answer Posted / san
0.276m3
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Describe the role of independent Quantity surveyor?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
what is difference between GTS bench mark and temporary bench mark
calculate the quantity of water for 1:6 cement mortar
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What do you mean by the word 'shear'?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
Explain moment of inertia and its importance.
Define What is passive earth pressure ?
How do you calculate the unit weight of concrete?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
at what pressure ply-wood is obtained by gluing wooden sheets
In reclamation works what are the importance of geotextiles and sand?
What is meant by engineering drawing?