Answer Posted / prashanth
1.Time consuming will be less.
2.Required strength will be obtaining.
3.Wastage of the materials will be reduced.
4.Project work will not get delay.
5.required shape of the structure will be obtain.
6.Quality of the structure can be maintain.
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
Technical Question of Civil Engineering
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
Permissible wastage of cement as per IS code ? In which IS code I get it?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
What is the zero value in quantity surveying
What are the types of slump?
Which are the top apps for you civil engineer?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
how to identify np3 pipe and np4 pipe
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
How much cement will require for 1Rmt Skirting laying