Answer Posted / prashanth
1.Time consuming will be less.
2.Required strength will be obtaining.
3.Wastage of the materials will be reduced.
4.Project work will not get delay.
5.required shape of the structure will be obtain.
6.Quality of the structure can be maintain.
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
How to check slab shuttering level.? Or check list for slab ?
What is c.g.i sheet which used for roof??
The largest size of paper used in plotter to print the drawing made by Autocad .
what is the function of GSB all class ?
How does siphoning work?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
how much used soil in 1 brick of standard size?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
What are the common ways of demolition?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?