beam top main reinforcement(25mm) was drilled off by
mistakely when making drill hole for dummy columns. any one
can give useful information for this issue or related code
or websites.
Answer Posted / suresh baria
Remove the top covering of beam, Observe the laying of top
reinforcement then drill the hole of required dia berween
the top reinforcementof beam for the errection of
reinforcement of dummy columns.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
What you understand by building codes?
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
What is Gsb tollens ?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
What is the difference between routing maintenance and major maintenance in school facilities?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
can i get civil engineering test papers.......?????
Why we provide hair pin for shed
In cement making,what is meaning of blend,fineness,density.
What does civil engineering mean?