how to calculate cement bag in RCC

Answer Posted / shibu

cement concrete 1:2:4 using 20 mm broken stone for
reinforced concrete works.1 m3
20 mm stone=0.9 m3
sand=0.45/ m3
cement=330 kg/m3

Is This Answer Correct ?    13 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

1922


sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.

2413


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

1199


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1371


please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?

1157






IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI

1594


How to calculate sand , cement quantity for 23mm thk brick work(10x10)

4730


Material calculation of cm 1:6 for 1sqm

1509


What is the difference between a wood shake and wood shingles?

704


How do you maintain water pressure?

661


What are the responsibilities of a site manager?

633


what is Brest Wall?

826


why we use aggregate,sand with cement in concrete?

8138


pls tell me about method of cutting length of ties column

2135


Mention what are the composition of a landfill?

730