what is the minium content of cementous material per cu
meter
Answer Posted / jay
The amount of cementitious mateiral is determined by amount
of portland cement plus amount of fly ash.The minimum
portland cement content should be 335 kg/m3 of concrete.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
What are the composition of a landfill?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Why should pumping be not used in case of concreting works?
In earth work 1300 cum soil how to calculate how many liters require in water
What do you mean by tolerance factor of concrete ?
what is the difference between replacement of cement by groundnut shell ash
What is Density of cement, sand & aggregate ?
RR masonry rate analysis
What is the difference between engineering stress and true stress?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
what is the mode of method of face bar measurement
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
Gidc technical que paper
What is the Roll of Water Bonding under VDF road?