how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.

Answer Posted / pervaiz

we have total 731 cu.ft
Now calculating
Cement
1/4x1.54x731 = 281.43/1.25 = 225.14 bags
Sand
1/4x1.54x731 = 281.43 cuft
Crush
2/4x1.54x731=562.87 cu.ft
Now verifying

Is This Answer Correct ?    5 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is conrete grade ,how are depent on concrete grad and size of concrete?

2036


in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?

1797


How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?

1186


it is a corrected question." make a list of engineering property(properties) of soil.

1591


how to calculate spacing rod in column

1426






What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1555


Explain major difference between auto level and dumpy level?

739


why are you joining in this (applied post) job and your aim for this job

2115


five benefits of using standard terminology in the measurement process

2854


An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.

1546


What are the different approaches in designing the floors of the service reservoirs?

754


Explain what is the difference between built area and super built up area?

680


What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????

2351


What are the advantages of cad?

633


in 100 cft = 1350 bricks in 100 cft = ? bloks

2374