how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / pervaiz
we have total 731 cu.ft
Now calculating
Cement
1/4x1.54x731 = 281.43/1.25 = 225.14 bags
Sand
1/4x1.54x731 = 281.43 cuft
Crush
2/4x1.54x731=562.87 cu.ft
Now verifying
Is This Answer Correct ? | 5 Yes | 10 No |
Post New Answer View All Answers
what is conrete grade ,how are depent on concrete grad and size of concrete?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
it is a corrected question." make a list of engineering property(properties) of soil.
how to calculate spacing rod in column
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Explain major difference between auto level and dumpy level?
why are you joining in this (applied post) job and your aim for this job
five benefits of using standard terminology in the measurement process
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
What are the different approaches in designing the floors of the service reservoirs?
Explain what is the difference between built area and super built up area?
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
What are the advantages of cad?
in 100 cft = 1350 bricks in 100 cft = ? bloks