Answer Posted / sajwan
it is the degree of matching of the load impedance with
the pure resistive load
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Draw the DOL starter and star delta starter drawing?
what are types of encoder
Pl. give me checklist for installation & commissioning of machine tool.
What is the meaning of dedicated earthing?
1.What is captive power plant? 2.What is national grid?Give brief idea.
why incomer bay is required before transformer bay if there are more than 1 nos. of transformer bay.
In aerodynamic turbines which element is NOT there a.stator b.compressor c. Fuel intake system d.fans
According to IEC60034-14, When the vibration monitoring system required for motor Bearing. above which KW, it is required? and for what type of bearing the vibration probe is provided.
WHAT IS THE SIGNIFICANCE OF VECTOR GROUPS IN TRANSFORMER? WHAT WILL BE EFFECT WHEN PHASE DISPLACEMENT CHANGES IN TRANSFORMER?WHAT IS THE NEED TO BE PHASE SHIFT CHANGE BETWEEN THE PRIMARY AND SECONDARY WINDING
in HT service 3ph 4 wire service Y-phase voltage shows zero . whether it is meter fault? or what be the reason ? if y-ph voltage zero ,can current is recorded? reasons for failure?
hi this is hema can anyone mail me previous years questions for the APPSC-A.E.E (in electrical stream.) ......thank u.
What is mean by hot and cold loop testing? What is the difference between them?
How capacitor improves pf
what is the grounding Calculation formula? spouse i want to provide grounding to 3phase 18kw motor or i want to provide ground to 3phase 10kva dry type transformere or you give me any exemple...... Thanks.
What is “pu” in ee?