Answer Posted / vidyasagar
its a leveling course and to avoid the contact with soil
from corrosion matter.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Difference between lime, distemper and plastic emulsion?
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
what is grade intersection?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
How much cement and water required for cement selery????
What is the outturn of Ceiling plastering
What is pre-stressed concrete?
In cement concrete how to check a quality of material also proportion of material at site ?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
What is the quantity of cement in mix m20 concrete?
What is Curtailing of R/F
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
acceptance criteria for concrete works