Please can anybody let me know how to calculate cement,
sand & aggregete content for one meter cube of concrete.
please if possible provide calculations for cement in no.
of bags, sand & aggregate in cu.mt.
Thanks.
Answer Posted / md umar
first of all any concrete mix design should be grade design
not define here .suppose ratio of concrete 1:1:2 (M25)for
calculate cement sand cource agregate .15.2/1+1+2 for 10m3
calculation of cement 15.2/1+1+2
15.2/4 or 0.37 cum
sand 0.37
cource aggragate 0.37*2 0.70 com
| Is This Answer Correct ? | 14 Yes | 2 No |
Post New Answer View All Answers
how much to get of BRC lapping in full yield and half yield ?
what is meant by residual strain?
What is the software used in civil engineering?
Slump Values for works?
Sir how to find cutting length for footing steel bars in the shape of "u"
what is mc arther pile?
insted of bentonite we can use any alternate material in piling ?
Minimum and maximum size of the building components
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
how to remove the quantity of metal 1 and metal 2 in concrete
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
Differentiate orthographic and isometric projections?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????