Answer Posted / k.prakashchandra
Both are mechanical units. BHP means Brake Horse Power
Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
What is the Resposiblity of Electrical Utility Engineer
A 100 kVA , 400 v/250 kv testing transformer has 8% leakage reactance and resistance on 100 KVA base . A cable has to be tested at 500 kv using the above transformer as a resonant transformer at 50 hz . if the charging current of the cable at 500 kv is 0.4 A find the series inductance required . Assume 2% resistance for the inductor to be used and the connecting leads . Neglect dielectric loss of hte cable . what will be the input voltage to the transformer ?
What is the role of feedback in a closed loop control system?
How would you relate your key competencies to this position?
What is a slack bus?
11000volt DG set carnt kaise banvay
Why do we perform an open-circuit test and short-circuit test on the transformer?
what is a composite error in current transformers, why occurs & in which it will occur i.e, either metering ct/ protection ct
diff. between tension mode & speed mode
i need to give section engineer (electrical engineer) for RRB. Please suggest some book
HOW TO CALCULATE THE REGULATION OF 100 AND 25 KVA TRANSFORMER
clarify types of motor operated valves and advantages
Is single load(eg: three phase motor) having all the components like positive,negative,zero sequence components during fault condition?
What is d main advantage of using double circuit 3 phase transmission ?
what is harmonics? what are the factors it will depend upon