Answer Posted / venky
it means stopping sight distance. it is the sum actual
distance covered before the stop and braking distance.
:=vt +v^2/2gf
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
How you can use different dimension tools in cad? What are the different dimensions available?
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
Water filter calculation formula
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What is the difference between tor steel and tmt steel?
How is improve my knowledge in construction industries....
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
What is the method of soil replacement test?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
What are the advantages of cad?
How do you convert wind speed into force?
what are the code used for residental building?
How will be cutting in timber plate size 600*400 column size