Any body please let me know how to prepare Method Statement
for Bored Cast in situ piles.
Answer Posted / prashanth
1. what is dia of pile
2. what is length of penetraion of pile in one hour.
3. what is the final depth of termination of pile.
4. what is the cum casting of pile.
5. plate laoad test of pile.
6. Dia of steel to be used.
7. Grade of the concrete as per design and Pouring of the
concrete in layer by layer.
8. Testing of pile like Intergrity test.
9. Removal of the termination slurry concrete.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is construction mitigation management?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
In which code the the maximum height of concrete casting has been explained
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What is the method of soil replacement test?
Basic civil interview questionsÂ
Will going from a 3-tap to 6-tap increase water pressure?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
How do we calculate absolute pressure?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet